New case study on production and generator testing [Siemens Gamesa]

Strong collaboration between GPower and Siemens

Siemens Gamesa is among the world’s leading wind turbine manufacturers, with nearly 100 GW installed worldwide. In connection with the establishment of a new factory in Cuxhaven, Germany, Siemens Gamesa recognized the need for a faster and more flexible test system to future-proof the production of wind turbine generators. A test system that could easily be reconfigured to measure future—perhaps radically different—generator models, and that in the long term could be rolled out across the many other diverse production lines at the factory.

About GPower

At GPower, we deliver robust and scalable solutions across industries, from research to production. Our modular software helps you optimize and streamline operations, so you can focus on your core business.

We offer
Read other articles

Read our other blog posts

Registration for GPower’s 2026 courses is now open
GPower attends the CenSec summer meetup
CenSec Summer Meetup 2026: A day of networking, perspectives, and collaboration
Meet GPower at DDAC 26 (Danish Defence Annual Conference) and learn more about automated test solutions – from R&D to production [See you at stand 66]