New Case about Production and Generator Tests! [Siemens Gamesa]

Strong Collaboration between GPower and Siemens

With almost 100 GW installed on a global scale, Siemens Gamesa (SG) is one of the world’s leading manufacturers of wind turbines. On the establishment of a new factory in Cuxhaven, Germany, SG realized the need for a faster and more flexible test system to secure the future production of wind turbine generators. A system that could easily be converted to measure on future – perhaps radically different – generator models. Moreover, a system that was ready to be implemented to other production lines at the factory.

Share:

LinkedIn
Facebook
Email
#blog

Previous Posts